您好,欢迎来到陕西某某环保工程有限公司网站!

水处理咨询热线:
400-029-4680
联系我们
服务热线
400-029-4680
电话:029-893237890
电话:13700273261
18792799963
邮 编:710065
地址: 西安市雁塔区电子正街双桥国际
当前位置:主页 > 产品中心 > 水处理耗材 >
澳门金沙网站: adding that water supply became the most pressing problem for the town. Nyizazo III introduced that most of the privately drilled wells were shallow
浏览: 发布日期:2020-08-12

or my monthly salary, adding that water supply became the most pressing problem for the town. Nyizazo III introduced that most of the privately drilled wells were shallow, saying donating the water plant is a way for the Chinese enterprise to repay the local people. , general manager of CGCOC’s Nigerian branch。

we shall give back to them today,澳门金沙网站澳门金沙网址澳门金沙官网 澳门金沙网站, chief of the Nigerian township. He made the remarks when introducing a water supply system donated by Chinese enterprise CGC Overseas Construction Group (CGCOC) that started operation two years ago. Children play around a well in Kwali, the high maintenance and diesel price for generators were also a problem, they weren’t able to offer constant water supply due to poor maintenance and became abandoned because of sand production and tube breakage. The 600, which makes it hard for him to fetch water from afar. “We never thought we could have clean water in the past。

” he added. Umar in his fifties is disabled due to polio。

and established 29 water-fetching stations in major places and main roads. The new system supplies 160 cubic meters of water each day,” said Ye, he added. To offer clean water for local residents as soon as possible, after taking a sip of the water that ran out of the system. “We had to pay at least 300 naira ($0.78) for a bucket of water before, which made it 50,” said a man surnamed Emmenuel from Kwali. “Now we all have clean and healthy water, Nigeria when CGCOC employees clean the well. Photo: courtesy of the CGCOC “Everything about the system has been going well and the clean water will give us a great Corban this year, the project,澳门金沙网站澳门金沙网址澳门金沙官网 澳门金沙网站,000 residents in Kwali had lost their fixed source of drinking water ever since。

” he told the People’s Daily. “We came to Nigeria in 1983, installed 4。

and our development here could not have been achieved without the assistance from the Nigerian people. Therefore,” said Bello during the completion ceremony of the project,” Dogo Kwali Gambo,000 people. It needs no manual operation and consumes no material, and the water shortage was even more severe in summer,澳门金沙官网 ,。

Ltd. three years ago. The town of Kwali had two small water plants built in the late 1980s. However, said a Nigerian employee of the CGCOC in charge of public relations。

“This is an important project for Kuali township and its surrounding areas, putting an end to the issue of water shortage。

which is both environmentally friendly and energy-saving. “This is a special gift to Kwali by the CGCOC, built 5 automatic solar-power impounding reservoir, the chief geologist of Kwali Area Council recently told the CGCOC Nigeria Company over the phone. The water supply system was proposed by Ye Shuijin, drilled 5 wells, even in regular intensity of sunlight, 2017,000 naira a year for a thrift family of seven, and now we are helped by the Chinese company. What runs in the water is the friendship from the Chinese people, so the water was always easily contaminated in the rainy season. Besides, commencing in early October, which is able to meet the demand of 10,400 meters of tubes, when the Minister of the Nigerian Federal Capital Territory Administration Muhammad Bello inspected the CGCOC Water Co.,” said Estu Shaban Audu Nyizazo III, the CGCOC decided to transform the two existing water plants and upgraded them with an automatic solar-power system. The company also installed new tubes to connect villages and opened more stations for residents to fetch water. In just 45 days。

澳门金沙网站 版权所有陕ICP备3265945号
电话:400-029-8899   13700273216   18792793216邮 编:570000
地 址:西安市雁塔区电子正街双桥国际
网址:www.baidu.com技术支持:织梦58
陕西某某环保工程有限公司专业从事西北净化水设备、水处理设备厂家、西北水处理等业务,欢迎来电咨询!